JAMMU, SEPTEMBER
08: In order to carry out work of removal of trees, the shutdown of 1kVfeeders
is being observed.
During the
shutdown, the power supply to Miran Sahib and its adjoining areas being fed
from MES Feeder, Miran Sahib to Kullian shall remain affected on September 11
and 13 from 6 am to 11 am.
Similarly, the
power supply to Kullian and its adjoining areas being fed from Kullian feeder
shall remain affected on September 15 and 18 from 6 am to 11 am.
Likewise, the power supply to Bawe Talab and its adjoining areas
being fed from Feeder no-4 and Special line JCP, College shall remain affected
on September 10 from 6 am to 11 am.
Post A Comment:
0 comments so far,add yours