Kick-starts work of laying water pipes at Qasim
Nagar
JAMMU, APRIL 11: Speaker, Legislative Assembly, Kavinder Gupta
today chaired the meeting of Rogi Kalyan Samiti (RKS) at Government Hospital
Gandhi Nagar and reviewed the progress of the institution.
During the meeting, Speaker took a detailed review
of physical and a financial achievement registered by the hospital and was
informed about the progress registered in various areas.
Vice Chairman RKS, Dr A D S Manhas briefed the
meeting about the works done, revenue generated and expenditure besides other
achievements and steps underway to improve medicare facilities in the hospital.
He also informed of the progress on decisions taken in the previous meetings.
VC RKS informed also informed about the major
achievements of the Hospital made during last 2 years regarding status of
outdoor/indoor patients, major and minor operations, deliveries, LSCS, and work
done report of other sections of the Hospital.
It
was also given out that the repair and renovation of recovery ward, Gynae ward,
Labor Room and Doctor Duty room with tiling, flooring and wood paneling has
been done.
Speaker expressed the satisfaction over the
improvement in overall functioning of the hospital. Responding to the needs and
requirements listed in the meeting, the Speaker assured full cooperation to
provide adequate health facilities and infrastructure to the people of the
area.
Kavinder Gupta also distributed cash awards and
trophies to the staff of the Hospital for their contribution and outstanding
performance to for the smooth functioning of the hospital.
Earlier, the Speaker kicked started the laying of
water pipes at Goswami Basti, Qasim Nagar near Bahu Fort.
During the visit, the local people highlighted
their demands regarding construction of main nullah passing through the area,
replacement of old poles and wires, construction of lanes and drains, adequate
clean drinking water, providing of Ration Card, Aadhaar Card, widow pensions
and other developmental issues of the area.
On the occasion, the Speaker said that with laying
of water pipes, the long pending demands of the locals for shortage of drinking
water in the area would be fulfilled. He directed the concerned authorities to
complete the work within a stipulated time frame.
Regarding construction and upgradation of main
nullah, he said that a proposal in this regard has already been approved and
the work on the project would be started in soon.
He stressed upon the locals that they should come
forward to avail full benefits from various state and centrally sponsored
schemes launched for the welfare of the people of the state.
The Speaker took round of the area to inspect the
various developmental needs and assured the people that genuine demands
projected by them would be redressed on priority basis.

Post A Comment:
0 comments so far,add yours