SRINAGAR,
MAY 11: According to the Power Controller, Kashmir Province, PDD
Bemina, Srinagar, in order to carry out twining, laying of conductor of
Ahmadpora Magam Beerawah line, necessary stabilization and
to carry out branch pruning/cutting of trees, the 33 KV line of Kulgan-Devsar,
Kulgam Yaripora, shall remain turned off on May 12 and 13 from 9 am to 5pm.
Also, 33 KV lines of Rawalpora Rangrate, Rawalpora Airforce, and
Ahmadpora Magam Beerwah shall remain turned off on May 14 from
9am to 4pm and May 12, 13 and 14 from 10 am to 5 pm respectively.
Accordingly, shutdown of 33 KV lines of
Habak-BAMK shall be taken on May 14 and Habak Zakura Burzhama, Habak
Hazratbal, Habak Lal Bazar on May 13. Also, shutdown is also scheduled for
Wanganpora BAMK, Wanganpora Khanyar, on May 15 and 33 KV line Wanganpora Soura on May 16 from 9 am to 6 pm.
Power supply to areas fed from
these receiving stations shall remain affected on the said dates and times.
Post A Comment:
0 comments so far,add yours