| Sham Choudhary stresses on timely completion; Reviews physical, financial achievements of PHE, I&FC, RTIC |
JAMMU, OCTOBER 21 – Minister for PHE, Irrigation and Flood Control Sham Lal Choudhary today
directed the Executive Engineers of the department to complete the work on
Water Supply Schemes within the fixed deadlines.
The Minister issued directions while reviewing the physical and
financial achievements of PHE, Irrigation and Flood Control and Ravi-tawi
Irrigation Complex here at Jal Bhawan.
The meeting was attended by Chief Engineer, PHE A.K Gandotra, Chief
Engineer, I&FC P.N.Bali, Chief Engineer, Ravi-Tawi Irrigation Complex
Rajeev Gandotra, Additional Secretary to Govt. PHE, I&FC Department Ashok
Kumar Sharma and other officers.
The meeting was informed that a total of 108 water supply schemes are
being constructed in Jammu including 1 in City-I, 5 in City-II, 11 in Rural, 13
in Akhnoor, 8 in Samba, 18 in Kathua, 5 each in Udhampur and Dharmari, 8 each
in Ramban and Kishtwar, 7 in Doda, 4 in Gandoh, 8 in Rajouri, 5 in Nowshera and
2 in Poonch.
The Minister directed to complete all the schemes by the end of this
year.
The Minister directed the Chief Engineers and Superintending Engineers
to conduct administrative inspections on regular basis to maintain transparency
and accountability in the functioning of the department.
The Minister further called for conducting advocacy workshops at all
levels for creating awareness among the people about the benefits of saving
water.
The Minister directed the engineers to improve the infrastructure and
working of the Working Standards Laboratories in all the districts of the
state. He further directed for speeding up the process of geo-tagging of PHE
installations in Jammu.
The Minister asked the engineers to maintain cleanliness in and around
PHE installations, besides taking up plantation drives regularly for increasing
the green cover.

Post A Comment:
0 comments so far,add yours