SRINAGAR, JUNE
30: Justice (Retd.) Permod Kohli, Member, Shri Mata Vaishno Devi
Shrine Board, called on Governor N.N. Vohra at the Raj Bhavan today.
Governor and Justice Kohli discussed certain legal issues relating to
the management of Shri Mata Vaishno Devi Shrine Board.
Articles by "SMVDSB"
Showing posts with label SMVDSB. Show all posts
SRINAGAR, JUNE 28: After taking charge as CEO, Shri Mata Vaishno Devi Shrine
Board (SMVDSB), Sh. Dheeraj Gupta, called on Governor N.N. Vohra, Chairman of
the Board, at the Raj Bhavan today. CEO informed Governor about the to-date
progress of the Board’s various flagship projects in Katra and the Shrine area.
Governor advised CEO
to ensure time-bound completion of all works and ensure satisfactory facilities
for all pilgrims.
KATRA, MAY 8: Governor N.N. Vohra, Chairman of Shri Mata Vaishno Devi Shrine Board (SMVDSB)
reviewed the completion of new track to Shrine, called “Tarakote Marg” with Sh.
Umang Narula, Chief Executive Officer; Dr. M. K. Kumar, Addl. Chief Executive
Officer; Sh. Anshul Garg, Additional CEO, SMVDSB; Sh. M.M. Gupta, Chief
Engineer and other concerned officers in a teleconferencing meeting at Raj
Bhavan, Srinagar today.
It may be
recalled that keeping in view the progressively increasing pilgrimage to the
Shri Mata Vaishno Devi Shrine, the Board had approved in February 2011 Governor
Vohra’s proposal to construct an alternate track between Banganga and
Adhkuwari, to decongest the rush of pilgrims on the existing 6 Km track from
Banganga to Adhkuwari and besides provide a pony free route from Katra to
Bhawan, which is exclusively meant for use by Yatris who walk to the Shrine.
The alternate 7
km track which is 6 meter wide, has an comfortable gradient, and very
attractive wayside amenities. The Tarakote Marg provides the pedestrian
pilgrims a cleaner and scenic route which has 2 Bhojanalayas, 4 View
Points and 7 Toilet Blocks. The toilet blocks have been provided with
facilities for the convenience of elderly pilgrims and for the specially-abled.
A medical unit fully
equipped with doctors, paramedics, medicines and equipment has been established
to facilitate the pilgrims on 24x7 basis.
The entire track
is based on a ramp type design, without any steps and has an average and smooth
gradient of one in 12 which, with interlocking antiskid tiles, makes it easier
for walking. The entire track has been aesthetically landscaped and over
46000 ornamental plants, herbs, flowering and avenue trees have been planted to
improve the ambience of the track and three floating fountains have been
installed in water bodies along the track.
The track is
illuminated with 500 energy efficient LED lights beside DG sets have been
installed for ensuring round the clock power supply. To provide high quality
filtered drinking water free of cost to the pilgrims, 16 Water ATMs have been
installed on the Tarakote Marg at approximate intervals of 400-500 meters.
Almost the entire
track has been covered with blue-roofed sturdy shelter sheds for the safety of
pilgrims against shooting stones and for protecting them from rain and
sunshine. The shelter sheds have been got specially designed by IIT Roorkee and
a welded mesh fence has been erected all along the track to ensure against
children or aged pilgrims meeting any accident on the hill slopes.
Identified
vulnerable spots have been treated for slope stabilisation to ensure
the safety of the pilgrims from shooting stones and landslides. The
interventions undertaken for slope stabilisation include cladding, cement
pressure grouting, high tensile wire mesh, gabions and construct debris flow
barriers etc.
Governor Vohra,
who has been monitoring the completion of this new track on a daily basis,
has travelled on the Tarakote Marg several times to review the nature
of services to be provided at the wayside facilities for the pilgrims. At the
request of the business community and local residents of Katra and Purana Daroor the
Tarakote Marg has been linked with the existing Banganga – Adhkuwari track at a
point which takes off near Gulshan Langar. The 1.5 km link road provides the
Yatris the choice of walking on the existing Banganga – Adhkuwari track or on
the purely pedestrian Tarakote Marg, once they have crossed the Darshani
Deodi.
At the request of
Governor N.N. Vohra, Chairman of Shri Mata Vaishno Devi Shrine Board, Hon’ble
Prime Minister of India, Sh. Narendra Modi, has very kindly agreed to formally
inaugurate the Tarakote Marg on 19th May, 2018.
Sh. Narula, CEO, has invited pilgrims to start using the Tarakote Marg
from the morning of 13th May, 2018 for their forward and
return journeys and get a taste of walking on the beautiful new track.
JAMMU, MARCH 16: The 62nd meeting of
Shri Mata Vaishno Devi Shrine Board was held at the Raj
Bhavan here today under the chairmanship of Governor N. N. Vohra, Chairman of
the Shrine Board.
The Board reviewed the to-date progress of all its major projects which are
presently underway and took a number of important decisions for further
improving the management and enlargement of infrastructure facilities for the
Yatra to the Holy Cave Shrine of Shri Mata Vaishno Devi.
The meeting was attended by Dr. E. Sreedharan, Dr. S. S. Bloeria, Mrs.
Sudha Murty, Dr. Ashok Bhan, Pt. Shiv Kumar Sharma, Mr. H. L. Maini, Mr.
Justice (Retd) Permod Kohli, Maj. Gen. (Retd) Shiv Kumar Sharma and Mr. B. B.
Vyas, all Board Members; and Mr. Umang Narula, Principal Secretary to the
Governor and Chief Executive Officer of the Shrine Board, Dr. M. K. Kumar and
Mr. Anshul Garg, Additional CEOs, Dr. (Brig.) M. M. Harjai,
Administrator, Shri Mata Vaishno Devi College of Nursing, and Mr. M. M. Gupta,
Chief Engineer of the Shrine Board.
With the objective of ensuring that the infrastructure which is created
in the future years is established at the correct locations, is aesthetically
designed and does not affect the environment, the Board had decided, over a
year ago, to have a Master Plan prepared for the areas around Bhawan,
Manokamna, Bhaironji, Adhkuwari and Banganga and, besides, to have an
architectural design of Durga Bhawan prepared by the School of Planning and
Architecture, New Delhi. In this context a series
of meetings have been held with the School of Planning and Architecture in the
past year. In today’s Board meeting the Master Plan, to be executed in phases, was
approved. The Board also approved the Master Plan of the Shri Mata Vaishno Devi
College of Nursing. Chairman Vohra directed that the construction of the
proposed two new hostel buildings should be completed before June, 2019.
The approved Master Plan involves a number of major interventions for
execution, under Phase-I, proposed to be completed by 2021 and Phase-II by
2031. The interventions proposed in the Phase-I include facilitating smooth
unidirectional movement of Yatris in the Bhawan area towards Atka and providing
vertical connections by installation of high capacity elevators along with
staircases on the track at multiple locations, widening of track to remove
congestion, improvement in the gradient of pathways, provision of large spaces
along the track to provide resting places for the Yatris. Besides, the Master
Plan entails construction of an extended exit route, creation of free
accommodation with self contained blanket stores, drinking water facilities, toilets blocks, bhaint shops,
catering outlets, additional lockers, and redevelopment of the entire existing
Market Area.
The Board also approved Architectural Design for construction of New
Durga Bhawan prepared by the SPA for providing on-floor free of cost
accommodation facilities for about 2000 Yatris by maximising the utilisation of space.
The Master Plan seeks to ensure that by 2031 90% of the total accommodation in
the Bhawan area will be free of cost for the Yatris.
The Board also approved the establishment at Jammu of a 30-bedded
Extension Centre of Shri Mata Vaishno Devi Narayana Superspeciality Hospital,
Kakryal, for providing various Day Care facilities, which would include Dialysis,
Chemotherapy, Diagnosis etc.
While expressing satisfaction at the pace of execution of various
ongoing projects, the Board directed CEO, Shrine Board, to ensure the timely
completion of all works and time-bound implementation of the Master Plan.
Subscribe to:
Posts (Atom)

